Located in Ávila and Segovia, the Cruz de Hierro and Villacastín hybrid energy parks offer an innovative platform for advancing renewable energy integration. These 28.75 MW and 28.2 MW facilities, managed by EDP Renewables, combine wind and solar power at a single interconnection point, optimizing energy production and efficiency.
These hybrid parks are set to enhance the reliability and sustainability of renewable energy production, while increasing overall energy output by up to 40%.
Objectives
ORION in Action – Iberia
ORION uses historical SCADA data from the PV plant (voltage, current, power, temperatures, irradiance) to detect, locate and classify faults:
INESC TEC: AI-based fault detection, location and classification from string level up to the inverter.
EDP R&D: fault detection and classification for transformers/power conversion systems, plus an O&M recommendation engine that identifies the best timing for maintenance to minimise LCOE and maximise ROI.
Results are visualised in the ORION Graphical Digital Twin. Users can also query an AI assistant (LLM) linked to an electrical model of the PV plant directly from the Digital Twin interface.
Take a look at the PV, Wind and Grid in Iberia in the ORION Digital Twin